March 6, 1999


The logs in the gables were put in place, some more rafter work was done and the porch floor was built.


Back - 3/6/99

Front - 3/6/99


March 13, 1999


The porch was completed, front dormers framed and they began decking the roof with tounge-and-groove 1x6's (the first of many layers of roofing - T&G, 15# felt, 2 layers of 1.5" thick foam insulation, 1x6 vertical strips, OSB decking, 30# felt, then shingles).


Front - 3/13/99

Back - 3/13/99


March 20, 1999


Most of the roof has all layers up to the felt and the dormers have the log siding on their sides.


Front - 3/20/99

Back - 3/20/99


March 28, 1999


The log crew finished up late Saturday evening (3/27) by putting in the doors and windows as the finishing touch.


Front - 3/28/99

Back - 3/28/99